| Value | Category | Cases | |
|---|---|---|---|
| Construction issues | 1 |
3.7%
|
|
| Electricity power outages | 1 |
3.7%
|
|
| Infrastructure Distractions due to Human beings themselves | 1 |
3.7%
|
|
| Kuchakaa kwa Miundo mbinu ya maji kama mabomba yanayotumika kusambaza maji,kupasuka kwa mabomba ya maji | 1 |
3.7%
|
|
| Kurekebisha miundo mbinu | 1 |
3.7%
|
|
| Low supply of water | 2 |
7.4%
|
|
| Maintainance | 2 |
7.4%
|
|
| Maintanence | 1 |
3.7%
|
|
| Maintanence and landslide | 1 |
3.7%
|
|
| Maintenance | 6 |
22.2%
|
|
| Miundombinu mibovu | 1 |
3.7%
|
|
| Poor infrastructure | 1 |
3.7%
|
|
| Poor system from the sources | 1 |
3.7%
|
|
| Power outages | 1 |
3.7%
|
|
| Problems on the supply pipes | 1 |
3.7%
|
|
| Repairing of the pipes | 1 |
3.7%
|
|
| Repairings of the pipes | 1 |
3.7%
|
|
| Repairs of water infrastructure | 1 |
3.7%
|
|
| Umeme ukikatika | 1 |
3.7%
|
|
| Water Pumps Maintenance | 1 |
3.7%
|